Building area: 7013㎡ (1600 degrees available)
Construction period: 75 days / 2020.06-09
Construction site: Luohu District, Shenzhen
Number of floors: 3 floors
Number of modules: 142 modules
Project features: modular building form, REMPC
Project significance: Located in Luohu District, Shenzhen, it was completed in 72 days and provided 810 degrees.
The school design adopts an enclosed floor plan layout to maximize the use of the site; The inner loop-shaped corridor is designed as a setback, and the roof is fully utilized, forming a three-dimensional interactive activity space of the roof garden, the setback corridor and the inner courtyard.
This project is one of the first large-scale semi-permanent modular school projects in Shenzhen, effectively solving the problem of local degree shortage.