Beijing Normal University Kindergarten Ming Guang Branch Project, Beijing
Pubtime:11.09.2023 【Font size : Big Mid Small

Beijing Normal University .png

Building area: 5465.93㎡

Construction period: 90 days/2020.09-11

Construction site: Haidian District, Beijing

Number of modules: 121

Project features: reconstruction, new construction, modularization, REMPC.

The renovation area is 2781.83 square meters; The new building area is 2684.1 square meters, including one teaching building (L-shaped), one kitchen on the east side, one doorman (and morning inspection) and one boiler room.